Standby generator and transfer switch
In San Antonio, a home standby generator is permitted by the Development Services Department (DSD) through the BuildSA portal. DSD’s Information Bulletin 250 (revised October 1, 2026) says any back-up system application should use the SOLAR permit type, which is a subtype of the general electrical permit and allows plan uploads. New electrical work must be done by a Texas-licensed electrical contractor and master electrician who is registered with DSD, and CPS Energy (the only utility serving the city) has its own distributed generation review and commissioning step. The FY 2027 Development Fee Schedule lists UPS/generator fees by kilowatt size band, starting at $1.84 (1–5 kW) and $3.74 (6–50 kW), plus a $57.50 electrical permit base fee in the existing-residential table. DSD’s residential page says homeowners must use licensed trade contractors for new electrical work.
IB 250 says that for any back-up system installation you select the SOLAR permit type in the BuildSA portal; it is a subtype of the general electrical permit. IB 250 defines eligible home backup power as generators and associated transfer switches, energy storage, and solar with storage, connected at 600 volts or less, serving one- and two-family dwellings. It lists items outside the third-party route: fuel gas connections and piping (separate plumbing permit), electric service or panelboard repairs, replacements or upgrades (separate electrical permit), unrelated feeders and branch circuits, and EV outlets and circuits. IB 250 also says a back-up system may not be used until all required inspections are done, including DSD inspections such as service upgrades and gas inspections for natural gas generators, and until CPS Energy commissioning requirements are met. DSD’s FY 2027 fee schedule and the City’s residential permits page do not list a separate generator-only permit type beyond this electrical/SOLAR process.
The City’s Residential Permits page says that while a homeowner can perform many types of non-structural work, “for your safety you must use licensed trade contractors for new electrical, plumbing and/or HVAC project components.” Its homeowner permit chart does not include electrical, and its Trade Contractor section lists electrical permits as obtainable by trade contractors licensed by the City or State and registered with the City. DSD’s electrical page says a State Electrical License must be registered with DSD to receive a permit, and IB 250 requires the installing business to hold a Texas Electrical Contractor’s license and a Texas Master Electrician’s license from TDLR. The Texas Department of Licensing and Regulation says anyone who performs non-exempt electrical work in Texas must be licensed and work through a licensed electrical contractor. Third-party plan review and inspection under IB 250 must come from someone independent of the installing contractor: a master electrician, an electrical inspector or a Texas-licensed engineer. This page does not research any state-law exemptions; ask DSD at 210-207-1111 if you think one applies.
DSD permits work inside San Antonio city limits. Properties in unincorporated Bexar County or other cities are different jurisdictions. DSD hours posted on its pages: Monday–Friday, 7:45 a.m.–4:30 p.m.
The FY 2027 Development Fee Schedule (revised October 2026) lists a UPS/Generator/Distributed Generation/Storage Batteries line in the electrical section by size band. The schedule’s existing-residential electrical table also has a $57.50 permit base fee, service-rating fees, and other per-item fees. The schedule does not give a worked generator example, and it is not stated whether the per-kW rate applies across all kW or to the size band; ask DSD for a quote or see the fee line under your application in BuildSA.
| Item | Amount | Source note |
|---|---|---|
| Electrical permit base fee (commercial and existing residential) | $57.50 | FY 2027 fee schedule, electrical section. |
| Generator / UPS / distributed generation / storage batteries, 1–5 kW | $1.84 | FY 2027 fee schedule; unit basis (per kW) as listed in the schedule’s size-band table. |
| Generator / UPS / distributed generation / storage batteries, 6–50 kW | $3.74 | FY 2027 fee schedule. Most residential standby units fall in this band. |
| Generator / UPS / distributed generation / storage batteries, 51–300 kW | $5.58 | FY 2027 fee schedule. |
| Generator / UPS / distributed generation / storage batteries, over 301 kW | $7.48 | FY 2027 fee schedule. |
| Service rating fee, 0–200 amps (if a service change is part of the job) | $3.74 | FY 2027 fee schedule. |
| Work with CPS fee (if a CPS outage is needed) | $2.47 | FY 2027 fee schedule; IB 250 says to select Work with CPS if an outage is required. |
| Electrical plan review fee | $115.00 | Fee schedule special services. IB 250 says the plan review fee is not assessed on third-party reviewed submittals. |
| Re-inspection fee | $57.50 | FY 2027 fee schedule, electrical special services. |
| Inspection schedule fee | $3.45 | Schedule says it is free if scheduled online. |
| Surcharges and payment fees | 4% + 4%; $11.50; 3% | Schedule disclaimer: unless noted, fees carry a 4% Technological Improvement and a 4% Development Services surcharge; applications not submitted through the online portal carry an $11.50 convenience fee; credit cards add 3%. |
| Natural gas piping plumbing permit | Not researched here | IB 250 says gas piping needs a separate plumbing permit; see the fee schedule’s plumbing section or ask DSD. |
Fees are from the FY 2027 Development Fee Schedule (revised October 2026) as fetched on November 28, 2026. The final charge depends on the line items selected on your application. Confirm in BuildSA or with DSD before paying.
Yes. DSD’s IB 250 says to apply through the BuildSA portal using the SOLAR permit type for any back-up system, and work may start only after a full permit is issued.
The City’s Residential Permits page says homeowners must use licensed trade contractors for new electrical work, and electrical permits are listed under trade contractors. Ask DSD at 210-207-1111 if you think you qualify for an exception.
The FY 2027 fee schedule lists generator fees of $1.84 (1–5 kW), $3.74 (6–50 kW), $5.58 (51–300 kW) and $7.48 (over 301 kW), plus a $57.50 electrical base fee and 4% + 4% surcharges. Ask DSD for the exact total for your job.
IB 250 says back-up generator applications go to CPS Energy at [email protected], CPS approval is preferred first, and commissioning requirements must be met before use.
Under Texas SB 1202, IB 250 allows a qualified master electrician, electrical inspector or engineer, independent of the installer, to review plans and inspect home backup power systems. DSD says it responds to the submitted declarations within two business days.
Every factual claim on this page is drawn from the government pages below, last checked on the date shown. If a link has moved, start at the AHJ website.
Most electrical permits still end with a licensed electrician doing the work — or at least signing off on an inspection. When referral programs are activated, the buttons below will go to those partners. Until then, hire a licensed electrician who is registered with the local AHJ, and verify their license with the state licensing board.
Homeowner-to-pro quotes for electrical work, including panel upgrades, EV chargers, and generator hookups.
Referral pendingPay-per-lead contractor matching for home-improvement trades. Modernize also sells generator leads to contractors (install, hookup, transfer switch).
Referral pendingA reserved slot for a direct referral agreement with a licensed electrical contractor who already works in this jurisdiction.
Ready to activate